You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Current »

Validator configuration

  1. Go to the Project settings page → Workflows → Actions → click Edit.
  2. Go to Validators on the selected transition → click Add condition.
  3. Locate SLA metric deadline validator by SLA PowerBox → Add.
  4. Select the SLA metric.
  5. Pick the deadline time condition: 
    1. At least [selected time] before the deadline.
    2. At least [selected time] after the deadline.
    3. Less than [selected time] before the deadline.
    4. Less than [selected time] after the deadline.
  6. Define the time after/before the deadline for the condition selected in the previous step.
  7. Optionally add a fixed value (e.g. validator is always true/always false) for a specific SLA state.
  8. Add the message to be displayed in case of validation failure (optional).
  9. Click Add and publish the workflow.

  • No labels